The Arizona Department of Transportation is scheduled to restart a construction project on Tuesday, May 21 to replace the bridge deck on State Route 169 at the junction with Interstate 17 near Camp Verde (I-17 mileposts 277-278).
The project, which has been on winter hiatus, will replace the existing bridge deck that moves SR 169 traffic over I-17. The bridge deck is the top surface of the bridge that motorists drive on.
Traffic restrictions on I-17 will be limited to the overnight hours of 8 p.m. to 6 a.m. Sunday evenings through Friday mornings to minimize traffic impacts.
Other restrictions include the following:
- The SR 169 bridge over I-17 will be narrowed to one lane only with alternating east- and westbound travel throughout the project. Temporary traffic signals will control traffic on the bridge.
- There will be a 12-foot vehicle width restriction on SR 169 over the bridge in the work zone.
Construction is anticipated to be completed late this summer 2024. For more information, please visit the project website.