8/06 ADOT says repaving work is done on a 13-mile stretch of Highway-93, south of Wikieup. Crews repaved the roadway, repaired bridges, improved drainage and replaced guardrail.

8/06 ADOT says repaving work is done on a 13-mile stretch of Highway-93, south of Wikieup. Crews repaved the roadway, repaired bridges, improved drainage and replaced guardrail.
